Skip to main content

Zafiro West/Opalo East Gas Lift Line Replacement

Year Completed:

Jan. 1, 2011

Client:

ExxonMobil-Mobil Equatorial Guinea, Inc.

Project Description:

In approximately six months, Trendsetter successfully delivered six subsea manifolds for the Mobil Equatorial Guinea, Inc. (MEGI) Zafiro West/Opalo East Gas Lift Line Replacement Project. FAT and SIT Testing was performed at Trendsetter’s facility in Houston, Texas. Deliverables included the following:

  • 6 subsea manifolds
  • Multiple 5” – 5,000 psi piggable connection systems
  • Multiple 5” – 5,000 psi valve assemblies
  • Multiple 2”- 5,000 psi gas lift chokes
  • All welded pressure containing piping
  • Complete with protective frame, mudskirt and handling frame

Pictures